The following Road Closure(s) or other road restrictions have been advised by
Essex County Council under Section 14(2) of the Road Traffic Regulation Act
1984, as amended and may affect village residents. Please note that
sometimes the dates provided are estimates only and the order may provide for an
extended period of closure in order to complete works particularly if
weather-affected.
Any queries regarding Road Closures ought to be made to the Area Highway Manager on 01206 838600.
| Dates |
Location |
Detail |
| 13th & 20th September 2010 for up to 6
months |
The Street, Chappel
 |
- To introduce a temporary 30mph speed limit on that length of
A1124 Colchester Road, Chappel/Wakes Colne from a point 365 metres
east of its junction with Spring Gardens Road south-east for a
distance of 560 metres for 3 months commencing 13th September. The
speed limit is currently 60MPH. The temporary speed limit is
required for the safety of the work force and public whilst
reconstruction works are undertaken on Broom House Bridge.
(Blue highlight)
- To temporarily close that length of The Street, in the Parish of
Chappel/Wakes Colne from its junction with A 1124 Colchester Road in
a south westerly direction for a distance of approximately 70 metres
to the entrance to The Swan car park for 6 months commencing 20th
September. The temporary closure is required whilst
reconstruction works are undertaken on Chappel Bridge and a new
footbridge is constructed. (Red highlight)
The alternative route for the closure of The Street will be via A
1124 Colchester Road towards Colchester to the A12, join the A12 towards
Chelmsford and London, leave the A12 at Junction 25 (Marks Tey junction)
and join the A120 towards Coggeshall and Braintree, turn right onto
Great Tey Road through Great Tey and Swan Street to Chappel and vice
versa. Access for pedestrians and dismounted cyclists will be
maintained at all times during the closure.
|
| 13th - 23rd September 2010 |
Fossetts Lane
 |
To temporarily close that length of Fossetts Lane, in
the from its junction with Rams Farm Road to its junction with Church
Road. The closure is scheduled to commence on 13th September 2010
for 10 days and is required for the safety of the public and
workforce whilst carriageway repair works are undertaken by Essex County
Council. The alternative route will be via Rams Farm Road - Moat Road
- Church Road and vice versa. Access for emergency service
vehicles, cyclists and pedestrians will be maintained at all times
during the closure. |
| 3rd - 4th September 2010 |
Halstead Road
 |
To temporarily close Halstead Road, Colchester between
its junctions with Chitts Hill and A 1124 London Road. The closure is
scheduled to take place between 8pm on 3rd September and 5am on 4th
September 2010 to enable Essex County Council to carry out essential
carriageway resurfacing works. An alternative route is available via A
1124 London Road, Essex Yeomanry Way, A1124 Halstead Road, and Halstead
Road between the A 1124 and Chitts Hill, and vice versa. Access to
property will be maintained during the closure as will access for
cyclists. |
| 22nd - 23rd August 2010 |
Chitts Hill Level Crossing |
To temporarily close that length of Chitts Hill for 20 metres either side of the level crossing
from 23:30pm on Saturday 22nd August until 06:00am on Sunday 23rd August. The closure is required
facilitate track maintenance work by Network Rail.
The alternative route will be via Halstead Road Spring Lane
Argent Lane and vice versa. Pedestrian access will be maintained
during the closure.
|
Weekends of:
17th - 18th & 24th - 25th July 2010 (& later in the year, 2nd - 3rd
October) |
A12 Junctions 27 to 29
 |
Overnight full closure of the A12 on both carriageways
between Junctions 27 and 29 as part of the constructions works to
develop the new Junction 28. More details are available in the A12
Newsletter
here. |
| 19th July 2010 for 5 days |
London Road, Great Horkesley
 |
To temporarily close London Road, Great Horkesley from
its junction with Coach Road to its junction with Fishponds Hill. The
closure is scheduled to start on 19 July 2010 for 5 days between the
hours of 8am and 5pm and is required to enable Essex County Council to
carry out urgent carriageway repairs.
An alternative route is available via Coach Road and A134 The
Causeway. Access to property will be maintained during the closure. |
| 12th July 2010 for 5 days |
Turkey Cock Lane, Eight Ash Green
 |
To temporarily close Turkey Cock Lane, Eight Ash Green
from its junction with London Road, Stanway to its junction with
Halstead Road, Eight Ash Green. The closure is scheduled to take place
on 12 July 2010 for 5 days and is required to enable carriageway repairs
by Essex County Council.
An alternative route is available via B1408 London Road, Stanway,
A1124 Essex Yeomanry Way, and A1124 Halstead Road. Access to
property will be maintained during the closure.
|
| 7th July 2010 for 4 days |
Vinesse Road, Little Horkesley
 |
To temporarily close Vinesse Road, Little Horkesley
from its junction with London Road to its junction with Fish Ponds Hill.
The closure is scheduled to take place on 7 July 2010 for 4 days and is
required to enable carriageway resurfacing by Essex County Council.
An alternative route is available via London Road and Fish ponds Hill
and vice versa. Access to property will be maintained during the
closure. |
| 5th July 2010 for 5 days |
Hall Road, West Bergholt
 |
To temporarily close Hall Road, West Bergholt from its
junction with Lexden Road to its junction with B1508 Colchester Road.
The closure is scheduled to take place on 5 July 2010 for 5 days and is
required to enable carriageway works by Essex County Council.
An alternative route is available via Lexden Road and B1508
Colchester Road. Access to property will be maintained during the
closure.
|
| 28th June 2010 for 5 days |
London Road, Great Horkesley
 |
To temporarily close London Road, Great Horkesley from
its junction with Coach Road to its junction with Fishponds Hill. The
closure is scheduled to take place on 28 June 2010 between 0730 hours to
1800 hours for 5 days and is required to enable surface dressing works
to take place by Essex County Council.
An alternative route is available via Coach Road, Old House Road,
A134 The Causeway and London Road and vice versa. Access to
property will be maintained during the closure.
|
| 29th - 30th May 2010 |
Chitts Hill Level Crossing |
To temporarily close that length of Chitts Hill for 20 metres either side of the level crossing
from 23:00pm on Saturday 29th May until 06:30am on Sunday 30th May. The closure is required
facilitate track maintenance work by Network Rail.
The alternative route will be via Halstead Road Spring Lane
Argent Lane and vice versa.
|
| 17th May 2010 for 5 days |
London Road, Great Horkesley
 |
To temporarily close London Road, Great Horkesley from
its junction with Coach Road to its junction with Fishponds Hill. The
closure is scheduled to take place on 17 May 2010 between 0800 hours to
1700 hours for 5 days and is required to enable machine surfacing and
surface dressing to the carriageway by Essex County Council.
An alternative route is available via Coach Road, The Causeway and
London Road and vice versa. Access to property will be maintained during
the closure. |
| 12th May 2010 for two days |
Chapel Road
 |
To temporarily close Chapel Road, West Bergholt,
between its junctions with Colchester Road and New Church Road. The
closure is to facilitate urgent carriageway repairs by Essex County
Council.
An alternative route is available via Lexden Road and Colchester
Road.
Access to property will be maintained during the closure. |
| 6th April 2010 for two weeks |
Coach Road, Great Horkesley
 |
To temporarily close Coach Road, in the Parish of Great
Horkesley, from its junction with Malvern Way westwards for 30 metres
from 6 April 2010 for 2 weeks. The closure is required for the
safety of the public and workforce whilst works to lay a new water main
is undertaken outside of Bishop William School.
The alternative route will be via Old House Road - A 134 The Causeway
and vice versa. |
| 8th March 2010 for 5 days |
Baker's Lane
 |
To temporarily close Bakers Lane, Colchester between
its junctions with Braiswick and Spring Lane; and Spring Lane,
Colchester between its junctions with Bakers Lane and Cymbeline Way.
The closure is required to enable urgent carriageway repairs to be
undertaken by Essex County Council. The alternative route is via
Cymbeline Way, Colne Bank Avenue, Westway, Bergholt Road and Braiswick.
|
6th - 7th March 2010 and
13th - 14th March 2010 |
Chitts Hill Level Crossing |
To temporarily close that length of Chitts Hill for 20 metres either side of the level crossing
from 23:50pm on Saturday 6th March until 06:30am on Sunday 7th March and
again between 23:00pm on 13th and 06:30am on Sunday 14th March. The closure is required
facilitate maintenance work to the level crossing by Network Rail.
The alternative route will be via Halstead Road Spring Lane
Argent Lane and vice versa.
|
| 4th March 2010 for 5 days |
Rams Farm Road, Fordham
 |
To temporarily close Rams Farm Road, Fordham from a
point approximately 220 metres west of its junction with the B1508
Colchester Road west for approximately 650 metres. The closure is
scheduled to start on 4 March 2010 for 5 days to facilitate urgent
repair work to damaged telephone cables by BT.
An alternative route is available via B1508 Colchester Road, Packards
Lane and Plummers Road and vice versa.
|
| 31st January 2010 |
Chitts Hill Level Crossing |
To temporarily close that length of Chitts Hill for 20 metres either side of the level crossing on 31st January
2010 between 01:50am and 06:50am or where appropriate signs are showing
and weather permitting. The closure is required for the safety of
the public and workforce whilst maintenance works are undertaken my
Network Rail.
The alternative route will be via Halstead Road Spring Lane
Argent Lane and vice versa.
Pedestrian access will be maintained during the closure.
|
25th January 2010 for
5 days |
A134 Nayland Road, and The Causeway, Great
Horkesley
 |
ECC has introduced a temporary 10mph speed limit under
Section 14(2) of the Road Traffic Regulation Act 1984, as amended, in
The A134 Nayland Road and The Causeway, Great Horkesley between its
junctions with London Road and Coach Road. The restriction is required
in the interests of public safety and the safety of workers whilst
resurfacing works are carried out by Essex County Council.
|
9th October for
3 to 4 days 2009 |
Chitts Hill Level Crossing |
ECC has temporarily closed Chitts Hill, Colchester for
a distance of 25 metres either side of the level crossing. The closure
will start on 9 October 2009 and is required because of the likelihood
of danger to the public due to a damaged electricity cable. Works to
repair the cable are expected to last approximately 3-4 days.
An alternative route is available via Argents Lane, Spring Lane,
Halstead Road and vice versa.
Access to property will be maintained during the closure.
|
| 24th - 28th August 2009 |
New Church Road
 |
To temporarily close New Church Road from its junction
with School Lane to its junction with Lexden Road commencing on 24th
August for 5 days. The closure is required for the safety of
public and workforce whilst drainage works are undertaken. The
alternative route will be via School Lane, B1508 Colchester Road, Lexden
Road and vice versa.
Pedestrian and emergency access will be maintained during the closure
although there will be no access for cyclists.
|
| 23rd August & 28th August - 1st September
2009 |
Chitts Hill Level Crossing |
To temporarily close that length of Chitts Hill Level
Crossing for 20 metres either side of the level crossing on 23 August
2009 between 01:50am and 06:50am and also from 11:30pm on 28 August 2009
to 07:00am on 1 September 2009 or where appropriate signs are showing
and weather permitting. The closure is required for the safety of
the public and workforce whilst maintenance works are undertaken my
Network Rail.
The alternative route will be via Halstead Road Spring Lane
Argent Lane and vice versa.
Pedestrian & cycle access will be maintained during the closure.
|
| 13th - 19th July
2009 |
Spring Lane

|
A temporary closure of Spring Lane between Spring Lane
roundabout and Chase Way between 09:30am and 3:30pm each day. The
closure is required for the safety of the public and workforce whilst
works to replace an aerial cable are undertaken by BT.
The alternative route will be via A133 Colchester by pass A134
Station Way North Station Road B1508 Bergholt Road Bakers Lane and
vice versa.
Access for emergency service vehicles, cyclists and pedestrians will be
maintained at all times during the closure.
Although not in or adjacent to the village this may affect villagers
using the route between Braiswick Road and Spring Lane Roundabout.
|
| 22nd - 26th June 2009 |
Argents Lane
 |
A temporary closure of Argents Lane, Eight Ash Green
and West Bergholt between its junctions with Chitts Hill and Spring
Lane. The closure is scheduled to start on 22 June 2009 for 5 days to
facilitate carriageway repair works by Essex County Council.
An alternative route is available via Chitts Hill, Halstead Road and
Spring Lane and vice versa.
Access to property will be maintained during the closure.
|
| 22nd - 26th June 2009 |
Chapel Lane |
A temporary closure of Chapel Lane, West Bergholt from
a point approximately 60 metres from its junction with Bourne Road for a
distance of 20 metres, to a point adjacent with the property Crispins.
The closure is required to enable Dyno-Rod to connect a re-routed sewer.
An alternative route is available via Bourne Road, Newbridge Hill and
Chapel Road and vice versa.
Access to property will be maintained during the closure as will
general access for cyclists and pedestrians.
|
| 1st June 2009 |
Chapel Lane |
A temporary closure of Chapel Lane from a point 60
metres north of its junction with Bourne Road proceeding northwards for
a distance of 100 metres. The closure is scheduled to take place
between 08:30am and 4:30pm, and is required for the safety of the public
and workforce whilst repair works are undertaken to water services.
The alternative route will be via Bourne Road Queen Road Chapel Road
and vice versa.
Access for emergency service vehicles and pedestrians will be
maintained at all times during the closure.
|
9th - 11th May,
22nd - 26th May and
31st May 2009 |
Chitts Hill Level Crossing |
A temporary closure of Chitts Hill for a distance of 20
metres either side of the level crossing. The closures are
scheduled from:
- 00:30hrs on 9th May until 07:00hrs on 11th May
-
23:30hrs on 22nd May until 04:00hrs on 26th May (now cancelled) and then
- 07:30am until 08:30pm on 31st May
... and are required for the
safety of the public and workforce whilst 'commissioning works' are
undertaken by Mouchel.
An alternative route is available via Halstead Road, Spring Lane and
Argents Lane and vice versa.
Access for pedestrians, including prams and wheelchairs, emergency
services, residents and visitors will be
maintained during the closure.
|
12th April and
3rd May 2009 |
Chitts Hill Level Crossing |
A temporary closure of Chitts Hill for a distance of 20
metres either side of the level crossing. The closure is scheduled
to take place between 01:35am and 06:55am on Sunday 12th April and and
01:45am and 06:50am on Sunday 3rd May and is to facilitate track works
by Network Rail.
An alternative route is available via Halstead Road, Spring Lane and
Argents Lane and vice versa.
Access for pedestrians, including prams and wheelchairs, emergency
services, residents and visitors will be
maintained during the closure.
|
6th April to
11th April 2009 |
Spring Lane, Eight Ash Green |
There will be a temporary closure of Spring Lane from
its junction with Heath Road to its junction with A1124 Halstead Road in
the Parish of Eight Ash Green
The closures are required for the safety of the public and workforce
whilst carriageway patching and repair works are undertaken by Essex
County Council. Access will be maintained for emergency service
vehicles, residents and visitors all times during the closure.
An alternative route will be available via Heath Road Wood Lane
A1124 Halstead Road and vice versa.
|
14th March to
16th March 2009 |
Chitts Hill |
A temporary closure of Chitts Hill for a distance of 20
metres either side of the level crossing. The closure is scheduled
to take place from 05:00 hours on Saturday 14 March to 06:00 hours on
Monday 16 March 2009 to facilitate track works.
An alternative route is available via Halstead Road, Spring Lane and
Argents Lane and vice versa.
Access for pedestrians, including prams and wheelchairs, will be
maintained during the closure.
|
CANCELLED on 2nd January
3rd to 4th January 2009 |
Chitts Hill |
A temporary closure of Chitts Hill for a
distance of 20 metres either side of the level crossing. The closure is scheduled to take place from
23:30 hours on Saturday 3rd January to 07:00 hours on Sunday 4th January
to enable maintenance work to the railway to be undertaken. An alternative route is available via Halstead Road, Spring Lane and
Argents Lane and vice versa.
Cyclists, pedestrians, prams and wheelchairs will be able to travel
through the closure.
|
CANCELLED on 1st December
8th December 2008 for 5 days |
Spring Lane, Eight Ash Green |
A temporary closure to all traffic of Spring Lane,
Eight Ash Green from its junction with Heath Road to its junction with
A1124 Halstead Road. An alternative route is available via Heath
Road, Wood Lane and Halstead Road.
Access to property will be maintained during the closure.
|
| 26th to 27th October 2008 and between 9th
and 11th November 2008 |
Chitts Hill |
A temporary closure of Chitts Hill for a
distance of 20 metres either side of the level crossing. The closures
are scheduled to take place from:
- 01:45 hours on Sunday 26 October to 01:10 hours on Monday
27 October 2008
- 23:00 hours on Sunday 09 November to 04:30 hours on Monday
10 November 2008
- 23:00 hours on Monday 10 November to 04:30 hours on
Tuesday 11 November 2008
... to facilitate track works.
An alternative route is available via Halstead Road, Spring Lane and
Argents Lane and vice versa.
Access for pedestrians, including prams and wheelchairs, will be
maintained during the closure.
|
| 25th & 26th October 2008 |
Chitts Hill & Halstead Road |
A temporary no waiting and no loading restriction in
the lengths of road and during the dates and times specified. The
restriction is required due to the likelihood of danger to the public
and to maintain safe access to Holmwood House during the NSPCC book
fair. No Waiting and No Loading Between 8.00am and 4.00pm on Saturday
25 October and Sunday 26 October 2008.
Chitts Hill both sides from the level crossing
southwards and westwards to its junction with Halstead Road.
Halstead Road, Colchester both sides from a point 20 metres west of
its junction with Chitts Hill to a point 20 metres south of its junction
with Chitts Hill.
|
| 3rd September 2008 for 3 days |
Fordham Place Road,
West Bergholt |
Fordham Place Road, West Bergholt will be temporarily
closed to all traffic for its entire length. The closure is
scheduled to start on 03 September 2008 for 3 days to facilitate
carriageway repairs. An alternative route is available via Colchester Road and Coney Byes
Farm Road and vice versa.
Access to property will be maintained during the closure. |